We need to make space in the garage for the new windows that will be installed soon. That meant moving some lead that was in various “storage devices” which included the floor.
Moved the range scrap ingots to the 2 bi s under the casting bench and the harder stuff to a milk crate next to the bench.
Did some rough math and assumed a 60-70% fill of available volume. That lead me to calculate that all told I have roughly a ton of lead in ingots. I still have 125 pounds of pure lead blocks, about 150 pounds of monotype pieces, and 2 full 5 gallon buckets of range scrap to melt down.
My wife was not impressed with the results of my calculations.
I gots some casting to do!
Moved the range scrap ingots to the 2 bi s under the casting bench and the harder stuff to a milk crate next to the bench.
Did some rough math and assumed a 60-70% fill of available volume. That lead me to calculate that all told I have roughly a ton of lead in ingots. I still have 125 pounds of pure lead blocks, about 150 pounds of monotype pieces, and 2 full 5 gallon buckets of range scrap to melt down.
My wife was not impressed with the results of my calculations.
I gots some casting to do!