I expect to be working some long days for the next four weeks. I let our main customer know that we were running a little low on work so if they needed anything before the Oshkosh fly-in next month let us know, we could get right on it. Oops! Now we have about 8-10 weeks of work on a four week schedule. One project requires me to write 60 CNC mill programs. Actually I need to write 2 programs and edit each of them 30 times, the parts are similar, require the same tools and are made from the same material but have slightly different dimensions. Write the basic code, change the numbers in the right places, and bingo a new part.